- Cental Railway CR878012:039h 2m21:05Mumbai Central railway stationGhevra railway station
Door to door 9h 46mCO2 43.2 kgChanges 0Refundable
Trains from Mumbai to Najafgarh start at €124.09 and take 9h 32m at their fastest.
Fares and seats move by the day. Price Mumbai to Najafgarh on the date you actually want, rather than on the date this page was built.
The Trains from Mumbai to Najafgarh starts at €124.09 and takes 9h 32m door to door, run by 5 operators over 1,310 km, with around 19 departures a day. Fares bottom out about 60 days before departure.
First and last are taken from the services we sell on October 6, 2026. The return direction keeps its own timetable and is not these times reversed.
€165.89 to €322.09 for one passenger across the 14 departure dates priced here. The low end is one day, not every day. Worked out from this corridor rather than held for anybody. The operator sets the price on the day.
Cental Railway runs this service and does not sell it here. Bookaway takes the payment.
Bookaway lists departures for Mumbai to Najafgarh on your date, and you pay on their side.
See Mumbai to Najafgarh on Bookaway
Or compare on 12GoOr compare on IRCTC
Partner link. We do not sell this ticket, and we earn nothing from this one.
What this journey usually costs, by departure date. It shows which days run dearer.
Typical fares
Based on what this route has cost recently. The operator sets the price on the day, and the live fare is confirmed when you book.
Door to door 9h 46mCO2 43.2 kgChanges 0Refundable
Door to door 9h 32mCO2 43.2 kgChanges 0Refundable
Changes at Jaipur, with 74 minutes between services and a walk of about 5 minutes.
Door to door 10h 14mCO2 38.8 kgChanges 1Refundable
| Operator | From | Fastest |
|---|---|---|
| Cental Railway | €124.09 | 9h 30m |
| €126.29 | 9h 32m | |
| €127.39 | 9h 30m | |
| €126.84 | 9h 30m | |
| €137.84 | 9h 31m |
The train gets you into Najafgarh. It does not get you a bed, and neither do we.

Sort by distance from Ghevra railway station and you can see which places are ten minutes on foot and which are not.
Search Najafgarh on AgodaOr compare on Booking.com
Partner links. We do not sell accommodation. We earn a commission when a booking completes, and it never changes what you pay.
The same search run across the whole booking window, so the shape of the curve is visible rather than described.
Median cheapest fare for each weekday, taken across the next three weeks of real prices.
The questions people actually ask about this trip, answered from the same prices and times the page above is built on rather than written once and left to go stale.
The Train from Mumbai to Najafgarh takes 9h 32m door to door, of which 8h 48m is spent moving. The route runs 1,310 km. The difference between the two times is reaching the terminal and leaving it at the far end, which every time on this page includes.
The Train from Mumbai to Najafgarh starts at €124.09 for one passenger, as of September 17, 2026. A typical fare is €141.69. Both are the total including taxes, supplier fees and our service fee, so the price here is the price at checkout.
5 operators run the Train from Mumbai to Najafgarh: Cental Railway, Indian Railway, Northern Railway, South Central Railway, Western Railway. Between them they file around 19 departures a day. The operator table on this page compares them on fare, journey time, cruising speed, fare conditions and what is provided on board.
The Train from Mumbai to Najafgarh leaves from Mumbai Central railway station and arrives at Ghevra railway station. Allow about 44m for reaching the departure terminal and leaving the arrival one. That time is already inside every door to door figure quoted on this page.
Fares for the Train from Mumbai to Najafgarh bottom out around 60 days ahead, at €102.64. The gap between the cheapest and most expensive lead time across the window is 214 percent, measured on September 17, 2026. Booking inside the final week has consistently cost more.
The Train from Mumbai to Najafgarh produces about 43.2 kg of CO2 per passenger over 1310 km, which works out at roughly 33 grams per passenger kilometer. That figure is for the whole journey and for one traveler, not for the vehicle.
Operators on the Train from Mumbai to Najafgarh publish Power outlets, Wi-Fi. That is what 5 carriers on this corridor state about their own fleets, across a journey of 9h 32m door to door. Where a carrier publishes nothing, this page lists nothing for it.
Places, coordinates, operators, which operator serves which pair, and every distance on this page are real and come from open data. Where a corridor has a filed timetable the departure times are real too, and ferry fares are the prices the operators publish themselves.
Derived from service area No carrier record names this exact pair. The operators listed publish a service area covering both places at a distance their mode plausibly carries people, which is evidence that the corridor is served and not evidence of a specific service. Pages state which, because presenting the two as the same thing would be dishonest.
Where no operator publishes a fare for a corridor, the price here is our own estimate, worked out from the real distance and the real operator through a fare curve that follows lead time, day of the week and season. It tells you roughly what the journey costs. It is not a seat anyone has agreed to sell, and the payment step will not take it.
Defined in full at Door to door, Fares, The booking window, Carbon
The train is the simple part. What you do once you are in Najafgarh is somebody else's catalog.

Day trips that leave Najafgarh in the morning and cover a good part of India by evening.
See Najafgarh on KlookOr browse GetYourGuide
Partner links. We do not sell tours or tickets. We earn a commission on a booking, and it never changes the price.